Construction and maintenance of civil protection and safety installations in the tunnels of the Madrid – Galicia high-speed railway line. Zamora – Pedralba de la Padreria section.
Project summary:
The project consisted of the construction and maintenance of the civil projection and safety installations of the tunnels of the Madrid – Galicia high-speed railway line, in the section between Zamora and Pedralba de la Pradería, in accordance with the Interoperability Technical Specification.
These facilities include emergency signaling and lighting, water supply, radio communications, ventilation system, gas detection, power supply, physical protection of doors, rescue areas and access roads, fire extinguishing, perimeter physical protection and remote control system.
Client / Property: ADIF / ADIF
Date of award:
Tender budget (VAT excluded): 5.493.764,48 €
Time of execution (bidding):
- 6 months (construction)
- 36 months (maintenance)
Scope:
The scope of the project consisted of the execution of the installations required by the TSI in 5 tunnels of less than 500 meters in length and in 2 tunnels of more than 1,000 meters in length in the Perilla de Castro – Pedralba section.
Key partners and collaborators:
This project was carried out in a joint venture with the company ELECOR.