The contract consisted of the electrification of 6.5 km of non-electrified Iberian gauge single track between the Guillarei triangle at the north exit of Guillarei station and Valeça do Minho on the Portuguese border using 3 kV continuous 3 kV compensated catenary type CA-160 but adapted to allow isolation suitable for 25 kV.
Client / Property: ADIF/ ADIF
Award Date: 05/07/2019
Tender budget (VAT excluded): 1.935.959,45 €
Time of execution (bidding): 6 months
Scope:
The scope of the project included the installation of the overhead line, the feeds from the Guillarei and Rendondela substations and the integration of the line disconnectors in the STE Noroeste remote control.
Key partners and collaborators:
This project has been entirely carried out by Telice.