Works derived from the project to update the construction project for the electrification of the railway corridor between the Enllaç-sa pobla stations, part of the SFM railway network.
The contract consisted of the electrification of the railway section of approximately 12 km between the stations of Enllaç and Sa Pobla. For this purpose, both the contact line system and the 1,500 V DC traction power supply system were installed and commissioned.
Client / Property: SFM / SFM
Award Date: 16/05/2017
Tender budget (VAT excluded): 14.390.365,60 €
Time of execution (bidding): 12 months
Scope:
The scope of the project included:
- Medium voltage (15 kV) electrical connections from the distribution company substations.
- Construction of the traction substations of Llubí and Sa Pobla, as well as their auxiliary facilities and power distribution network.
- Overhead contact line type CA-220 adapted to metric width
- Integration of equipment and disconnectors in Palma’s energy remote control command post.
Key partners and collaborators:
This project was carried out in a joint venture with the companies EIFFAGE and AZVI.