Execution of the construction project for the overhead contact line installations and associated systems for the Valladolid – León section of the north – northwest high-speed railway corridor.
Project summary:
The project consisted of the installation of a C-350 type overhead contact line system with independent mechanically compensated catenary for the support and contact wire, suitable for a design speed of 350 km/h for the high-speed line between the stations of Valladolid and León.
Client / Property: ADIF / ADIF
Award Date: January 31, 2014
Tender budget (VAT excluded): 37.763.391,32 €
Time of execution (bidding): 18 months
Scope:
The scope of the project included the overhead contact line system, catenary and feeder gantries, switchgear, switchgear heating systems, tunnel lighting systems and consumer supply connections.
Key partners and collaborators:
This project has been carried out in a joint venture with SIEMENS.